2013.04 |
LotteMart (13 stores) Communication cabling |
Cabling work |
LOTTEMART |
2013.06 |
IL JIN display : Air compressor installation |
CAN communication |
Atlas Copco |
2013.07 |
Seoul Milk : Air compressor installation |
Electrical installation, Flow monitoring |
Atlas Copco |
2013.07 |
KCTECH : monitoring system |
Alarm monitoring panel |
KC Tech |
2013.08 |
SeoulMilk : ES installation |
CAN communication |
Atlas Copco |
2013.08 |
KCTECH #3 :ESinstallation |
CAN communication |
KC tech |
2013.08 |
[Thailand] Compressor Test Machine |
Air Test Bed System |
EMERSON |
2013.09 |
KT&G : Monitoring |
HMI modification, Communication Cabling |
Atlas Copco |
2013.10 |
Youngpoong refinery factory |
PLC panel, HMI workstation |
Atlas Copco |
2013.11 |
DM Bio : Compressed air system |
Field instruments, PLC panel, HMI workstation |
Atlas Copco |
2013.12 |
[Brazil] G-Cell project |
Compressor Power Junction box |
Atlas Copco |
2014.01 |
ATLAS COPCOAIR DRYER |
Insulation work x 2set |
Atlas Copco |
2014.02 |
E-mart : Refrigeration renewal |
Control Panel x 65sets |
ULON |
2014.03 |
[Vietnam] TB2 Power Plant |
PLC Panel, HMI system |
Atlas Copco |
2014.04 |
Woori Engineering : Compressor system |
Air Dryer, After cooler, Fileters |
Woori Eng. |
2014.04 |
YoungNam LPC: Chiller replacement |
20RT Chiller x 2sets |
YoungNam LPC |
2014.05 |
LOTTE Anseong factory : Compressor Automation |
PLC Panel, HMI system , Flow meter, Installation |
ChangHa Eng. |
2014.05 |
Daeduck Electro.: ESCO |
Power Installation, Communication cabling, Power meter, Flow meter, HMI system |
Samsung S-one |
2014.05 |
PTK : Air Dryer vessel |
Insulation x 4sets |
PTK |
2014.05 |
[Indonesia] Compressor Test Machine |
Air Test Bed System |
EMERSON |
2014.07 |
DeokSo Water purification plant |
N2 Generator Package |
Xylem water solution |
2014.07 |
Food One : Compressor |
Electrical installation |
Atlas Copco |
2014.07 |
KT&G : Compressed Air system |
MCCB panel, Power & Communication cabling work |
Atlas Copco |
2014.07 |
PTK : Air Dryer, Filters |
Insulation works |
PTK |
2014.08 |
Jonggeundang Pharm. : Compressor |
HV Reactor starter(750kW,3.3kV) |
Atlas Copco |
2014.08 |
Mando : Compressor |
HV Reactor starter(650kW, 3.3kV) |
Atlas Copco |
2014.08 |
GoChon Water purification plant |
Compressor, Blower repair work |
Kimpo water & waste water plant |
2014.08 |
YoungNam LPC: refrigeration renewal |
Condensing unit, Unit cooler Control & Electric installation |
㈜영남엘피씨 |
2014.09 |
Hankook airro: Chiller |
5HP chiller ass’y(2st. HX type) |
HanKook Airo |
2014.10 |
Seoul Milk : Compressor Electrical installation |
Electrical & communication cabling |
HanYang ENG. |
2014.10 |
Purex : Compressor |
Power, Air piping, installation |
Atlas Copco |
2014.10 |
Seoul Milk : Compressor |
Electrical & communication cabling, Flow monitoring |
Atlas Copco |
2014.11 |
KeumHo tire : Compressor |
Reactor starter, Flow meter |
Atlas Copco |
2014.12 |
Bouch Electric: Dew point monitoring |
Dew point meter, Monitoring panel |
Atlas Copco |
2014.12 |
Samsung Elec. : Compressor communication |
Fiber optic communication cabling |
Atlas Copco |
2015.03 |
Goryu refinery : compressor monitoring |
Communication cabling& Work station |
Atlas Copco |
2015.03 |
STX :GARRAF (Iraq) project |
PLC control panel (Siemens) |
Atlas Copco |
2015.04 |
Gwanggyo Water purification plant |
N2 Generator Package |
Xylem water |
2015.05 |
Hynix : Compressor |
Piping work |
KK ind. |
2015.05 |
WinPac : ESCO |
PLC panel, flow meter, power meter, HMI system |
WinPac |
2015.06 |
Emerson : Compressor test machine |
ATBS x 3 sets |
EMERSON |
2015.06 |
Hyundai motors : Compressor |
Power meter, Alarm system |
Atlas Copco |
2015.07 |
HEC : Compressor control (Abu Dhabi) |
PLC control panel(AB) |
Atlas Copco |
2015.09 |
HEC : Chiller for H2 generator (Algeria) |
30HP Chiller x 4Sets |
ASPE inc |
2015.10 |
In Cheon Global Univ. |
Vacuum pump system (3.7kW x 2) |
JEMACO |
2015.10 |
Shinsegae Food (O-San) |
Electric & Control installation PLC panel & HMI system |
THI industry |
2015.11 |
CJ Food (Jeon ju factory) |
Electric & Control installation |
THI industry |
2015.12 |
Shinsegae Food (Icheon1 factory) |
Electric & Control installation PLC panel & HMI system |
THI industry |
2017.01 |
Kiamotors (HwaSung Factory) |
Motor Starter & Cable installation |
Atlas copco |
2017.01 |
Hyunda Mobis (Jincheon factory) |
Motor Starter & Cable installation |
Atlas Copco |
2017.02 |
Shinsegae food Icheon factory |
Monitoring system, Electric installation |
TaeHwa ind. |
2017.02 |
Lotte Beer ChungJu Factory |
Master PLC Panel For Compressed Air System |
Atlas Copco |
2017.03 |
Lotte Chilseong Beverage |
Electrical Panel, Piping installation, Cooling water system |
Atlas Copco |
2017.04 |
S-OIL RUC Project / Dryer package |
PLC Control Panel : AB ControlLogix 1756 (Reduntant) |
Keum Sung Hightech |
2017.05 |
POSCO CHEMTECH COMPRESSOR CONTROL SYSTEM |
MITSUBISHI Melsec-Q PLC Monitoring system, Elect. installation |
POSCO CHEMTECH |
2017.08 |
Song Hau2 / Vietnam |
Master PLC Panel : Siemens S7 (Redundant configuration) |
Atlas copco |
2017.08 |
Corning (Cheonan Factory) |
Emergency Air supply system control panel |
Corning |
2017.09 |
SBPL / Philippines |
Master PLC Panel : AB ControlLogix 1756 (Redundant configuration) |
Atlas copco |
2017.09 |
Hynix M-14 |
Dryer PLC control system : Mitsubishi |
Keum Sung Hightech |
2017.09 |
Daeduckelectronic |
Monitoring system, Motor starter, Elec. installation |
Daeduck |
2017.09 |
Daeduck electronic |
Monitoring system, Motor starter, Elec. installation |
Daeduck |
2017.09 |
ADD / Daejeon |
Motor Starter & Cable installation |
Atlas Copco |
2017.02 |
MASINLOC / Phillippines |
Master PLC Panel : AB ControlLogix 1756 (Redundant) |
Atlas copco |
2017.10 |
Shinsegae Sammool factory |
MCCB Panel, Electrical installation for cold rooms |
Taehwaind. |
2017.12 |
Shinsegae Food Eumsung factory (Pineapple coldroom) |
PLC Panel, Electrical installation for cold rooms |
Taehwaind. |
2018.01 |
Mobile H2 station |
Master PLC Panel (LS), Ex-d Electrical installation |
Hylium ind. |
2018.03 |
Hyundai-Rotem |
Dryer PLC panel |
Keumsung-Hitech |
2018.03 |
Goyang Biomass |
Inverter control Panel, Ex-d Electrical installation |
Goyang Bio |
2018.04 |
Shinsegae Food Osan New factory |
PLC Panel, Electrical installation for Refrigeration system |
Taehwa ind. |
2018.04 |
Hynix Icheon Plant |
Compressor modification / Control panel, Inlet filter, PSV |
Atlas Copco |
2018.05 |
Duckyang Gas |
Dryer control panel |
GSA |
2018.06 |
Atlas Copco Vietnam |
Compressor & Dryer modification |
Atlas copco |
2018.06 |
CTCI / Malaysia |
PLC Panel : AB ControlLogix 1756 (Redundant configuration) |
CTCI |
2018.07 |
H2 tank skid |
Explosion proof control panel, Electrical installation |
Hyliu mind. |
2018.10 |
Heesung chem. N2 systme |
HMI system for N2 generator |
Gastech |
2018.11 |
UZGTL / Uzbekistan |
Sampling panel, Installation accessories for detector |
Honeywell |
2018.12 |
OCI Gunsanplant |
Dryer PLC panel (Schneider PLC) |
G.A.Tec |
2018.12 |
Samsung SDI |
Compressor Control panel modification |
Atlas Copco |
2018.12 |
Al Zor PJT / Kuwait |
Sampling panel, Installation accessories for detector |
Honeywell |
2018.12 |
Karbala PJT / IRAQ |
Sampling panel, Installation accessories for detector |
Honeywell |
2019.01 |
Samsung Elec. / Suwon |
HMI system for compressors |
Atlas Copco |
2019.01 |
MELAKA / Malaysia |
Master PLC Panel : AB ControlLogix 1756 (Redundant configuration) |
Atlas copco |
2019.03 |
MELAKA / Malaysia |
Piping engineering, Spool piping |
Atlas copco |
2019.03 |
SK Hynix _ WT |
PLC control panel 3ea for air dryer |
Keumsung Hitec |
2019.04 |
SAMSUNG ELEC. _ HWASUNG |
Compressor Control panel(2ea) modification work |
Atlas copco |
2019.06 |
KCTech_ Ansungfactory #1,2,3 |
Monitoring system for air compressors |
KC Tech |
2019.07 |
SAMSUNG SDI / Malaysia |
REACTOR STARTER PANEL 750KW, 2 SETS |
Atlas Copco |
2019.07 |
SAMSUNG ELEC. _ PyeongTaek |
Compressor Control panel(10ea) modification work |
Honeywell |
2019.08 |
CIREBON CCPP / Indonesia |
Master PLC Panel : AB ControlLogix 1756 (Redundant configuration) |
Atlas copco |
2019.09 |
Hyosung DaNang factory / Vietnam |
2x355KW Reactor Starter Panel , 2x315KW Reactor Starter Panel |
Atlas Copco |
2019.10 |
Hyundai Mobis _ Chungju |
2 x 630kW MV soft starter |
Atlas Copco |
2019.11 |
SAMSUNG SDI _ ULSAN |
Dryer control panel : AB ControlLogix 1756 |
Keumsung Hitec |
2019.11 |
BST PJT / Thailand |
Master PLC Panel : Mitsubishi Q series |
Honeywell |
2019.11 |
POSCOVINA / Vietnem |
Compressor monitoring system : CIMON SCADA |
Atlas Copco |
2019.12 |
HL GreenPower _ Chungjufactory |
Installation of Communication network for compressors |
Hyundai BAS |
2019.12 |
Pulmuone_ Osong Lab center |
PLC control, Electric installation for refrigeration system |
ACE R&A |
2020.02 |
Lotte Chilsung Beverage / Ansung |
Compressor Group Control system : LS PLC, CIMON SCADA Electricalinstallation, Piping |
Atlas Copco |
2020.04 |
2020.04 Seoul Milk / Yangju |
Compressor Group Control system : LS PLC, CIMON SCADA Electrical installation |
Atlas Copco |
2020.04 |
SAMSUNG Elec. / Philippines |
2 x 630KW Reactor Starter Panel |
Atlas Copco |
2020.05 |
Linde Korea / Kiheung |
H2 compressor control panel PLC : Siemens S7 |
Woosung UST |
2020.07 |
2020.07 Hyundai Mobis/ Chungju |
Electrical installation, Piping installation, Duct installation |
Atlas Copco |
2020.07 |
IMI Valve Testbench/ Chunan |
Control panel : LabView |
HAWE Korea |
2020.09 |
Samcheok power plant / Samcheok |
6sets of MCC panels for Hydraulic Power system |
HAWE Korea |
2020.10 |
Samyangsa/ Asan |
Electrical installation, Piping installation, Duct installation |
Atlas Copco |
2020.10 |
SAMSUNG SDI / Hungary |
2 x 450KW Reactor Starter Panel |
Atlas Copco |
2020.11 |
3M / Hwasung |
Electrical installation, Piping installation, Duct installation |
Atlas Copco |
2021.01 |
Hyundai Uiwang R&D/ Alkaline H2 generation system |
HMI / PLC control program |
SUSO Energen |
2021.01 |
Samcheokpower plant / Samcheok |
[2nd] 6sets of MCC panels for Hydraulic Power system |
HAWE Korea |
2021.01 |
DaeduckElec. |
Piping, Electrical installation, Soft starter |
Shinsung Eng. |
2021.02 |
Dow Chemical CheonAnfactory |
Air dryer panel modification, Filter & Drying agent replace |
Dow Chemical |
2021.02 |
SK innovation / H2 compressor |
Ex-d Control panel & Electrical installation |
Woosung UST |
2021.02 |
HAWE Korea CheonAn factory |
50kVA AVR &Electric motor |
HAWE Korea |
2021.03 |
Wonik materials / B2H6 Mix PJT |
Z-purge Control panel & Ex-d Electrical installation |
Woosung UST |
2021.03 |
Hyundai mobis / Daegu factory |
PLC control panel for air dryer |
Dinno tech |
2021.04 |
Samsung C&T / Fujairah F3 CCPP |
PLC control panel / Siemens S7 redundant system |
Atlas Copco |
2021.05 |
KEPRI / Naju P2G_H2 production |
Ex-d Electrical installation |
JEA ENG |
2021.05 |
Solvay Chemical Ulsan factory |
Ex-d Control panel & Electrical installation |
Woosung UST |
2021.06 |
Samcheok CCPP. |
Gas Sampling panel |
IMI critical eng. |
2021.06 |
Samsung Elec. |
Installation work for compressor |
Atlas Copco |
2021.06 |
Fluorine Korea / F2 Gas Filling system |
Ex-d Control panel & Electrical installation |
Woosung UST |
2021.07 |
SAMSUNG SDI / Hungary |
2 x 630KW Soft Starter Panel |
Atlas Copco |
2021.08 |
Samyangsa Asan factory |
Electrical installation work |
Samyangsa |
2021.08 |
Lotte Chilseong Ansung factory |
SCADA system for air compressor system |
Changha Eng. |
2021.09 |
Sungju H2 station / Changwon |
SCADA program installation |
JeaEng. |
2021.10 |
H2 fuel cell ship / Gangwon TP |
Ex-d control box & H2 piping with instrument |
VOGO eng. |
2021.11 |
Mobile H2 station / Chungbuk TP |
Ex-d PLC control panel, Electrical installation, HMI & SCADA system, Engineering |
GTC |
2021.11 |
Samhwa paper Cheongju factory |
PLC panel & SCADA system |
A&E |
2021.12 |
Samsung Elec. P3 Plant |
Control panel modification |
Atlas Copco |
2021.12 |
Hyundai Mobis Jincheon factory |
Compressor & Electrical installation |
Atlas Copco |
2021.12 |
Hyundai Motors Euiwang R&D |
Compressor & Electrical installation |
Atlas Copco |
2021.12 |
DBNR project |
Gas detector accessories, Engineering & Documentation |
Honeywell analystics |
2022.03 |
Samsung Elec. P3 Plant |
Control panel modification Drain system, PSV replace |
Atlas Copco |
2022.07 |
Samsung Elec. CheonAn, Hwasung Plant |
Control panel modification |
Atlas Copco |
2022.08 |
Hyosung Vietnam factory |
280kW Reactor starter panel |
ATC Vina |
2022.09 |
Hydrogen Reformer for Incheon site |
Electrical installation |
Hyundai Rotem |
2022.09 |
Edward CheonAn & Tangjeong factory |
Electrical & Mechanical installation |
Atlas Copco |
2022.10 |
Wartsila Engine / DSME |
Commissioning Preperation |
DSME |
2022.11 |
Samsung Elec. C3 Plant |
Control panel modification Drain system, PSV replace |
Atlas Copco |
2022.11 |
Hydrogen compressor test facility / GTC |
Electrical installation |
JEA eng. |
2022.11 |
Tongyoung Power Plant |
PLC panel & HMI system |
IMI critical eng. |
2022.12 |
Hydrogen station / Hyundai steel |
PLC Control Panel, Motor starter, HMI SCADA system Electrical installation |
Hyundai Rotem |
2022.12 |
H2 compressor / LG Chemical |
JB wiring & cable installation |
Wosung UST |
2022.12 |
Tokyo Electron Hwasungfactory |
PLC control Panel & HMI system |
Kyungwon Mach. |